Installation of bicycle loop detectors at intersections in the downtown and at West Poplar/NC 54, to advance the traffic signals for bicyclists.
STATUS
- The contract was awarded to Garrett James Construction and Notice to Proceed issued in June 2025.
- Pre-construction meeting was held on August 2025. Chapel Hill staff requested some modifications to the signal equipment specified in the approved plans, which required a contract change order and delayed the project start time.
- Construction is largely completed.
- The municipal agreement with NCDOT has been amended to reflect additional funding and updated project milestones.
Next Step(s) with anticipated schedule:
- Install bike loop thermoplastic markings; temperature sensitive.
- Administrative close-out.
NETWORK
Installation of bike loop detectors at key locations downtown should work in concert with East Main Street bike lanes to begin to complete the bicycle infrastructure in the downtown.
- The project is identified in the 2009 Carrboro Comprehensive Bicycle Transportation Plan & 2020 Bicycle Plan Update.
Related Projects/Plans:
- Capacity analysis/possible road diet to add bike lanes to North Greensboro Street (NCDOT Resurfacing).
- Modifications to the traffic signal timing in the downtown.
As noted in the 2020 Bicycle Plan Update report on October 18, 2022, work is underway to develop a restriping plan for North Greensboro Street. Part of the plan development involved conducting a capacity analysis to determine a possible lane reduction to provide space for bike lanes, a change that could affect the lane alignment at North Greensboro and Weaver and by extension the placement of bike loop detectors. The analysis, however, determined that a lane reduction was not feasible.
The possible conversion of East Weaver Street to a bike-ped only facility may involve shifting the locations of some bike loops to better accommodate changes in travel lane usage.